Some projects carried out.

Parcel and Construction Update – Ciudad de Trelew

Survey and elaboration of the cadastral mapping of an area of 35km2, the determination of the area built on each plot and the implementation of a modern and efficient Cadastral Geographic Information System, which allows to manage the graphic and alphanumeric information related to all plots, construction contours and the area associated with each of them.

Development of a Mobile Geographic Management System

“State of Situation” is a mobile decision support system, geographically representing the status of the various operational variables necessary for the management of water and sewer networks throughout the company concession, covering CABA and several partidos of Gran Buenos Aires.

Development of the Rio de la Plata GIS System – AySA.

Implementation of a Geographic Information System that links information related to the quality and hydrometeorology of the Río de la Plata and facilitates access to the information corresponding to Georeferenced Measurement Points, quickly, clearly and uniquely, allowing in turn to carry out queries and analyses with different output formats.

Regularization – Edenor

Provision of professional services to regularize the legal status of EDENOR facilities located in private properties in the Metropolitan Area of Buenos Aires.

Audit of the Paso Services – ENRE

Survey and study in relation to the affectation and constitution of the easement of electroducts of electrical installations owned by distributors and/or carriers.

Informatization of the Electricity Regulatory Organism of the Province of Rio Negro (EPRE)

Systematization of the process of quality control of the information received from the distribution companies, in order to assure the community that: the published indicators, the credited compensations, the information to users, the levels of technical service and quality of the product delivered, the trade indicators, the subsidies granted, among others, are the actually provided and informed, according to the current regulatory framework.

Por industria

Por tipo de proyecto

Por tecnología